Here are a few pictures to demonstrate the progress of the basement.
| Walls are taped in prep for the ceiling paint |
| We're almost ready |
| Full body suit and the primer goes on |
| Lumber is delivered |
| Moved the lumber into the house |
| Industrial ceiling look is done |
| We think it will do the job |
| Now we can get the lumber downstairs |
| The first wall is up and the bath vent awaits the finish job |
| Another wall ready to go up |
| Bob the builder...well the assistant anyway |
| The pile dwindled, the scraps are ready to be taken out and the extra lumber goes back for a refund |
| The framing is done |
| The bathroom space awaits the next steps and we are at a point to have the flooring installed in the other space |
No comments:
Post a Comment